A turquoise pool edged in brick pavers below a clipped hedge
BASINGet a Quote

BASIN POOLS

Your dream pool starts here

A small paragraph over here to describe what the company is about, what separates them, what exactly they can do for the customer aswell

  • 300+pools made
  • 500+renovations
  • 1k+happy customers

BASIN POOLS

Your dream pool starts here

A small paragraph over here to describe
what the company is about, what separates them,
what exactly they can do for the customer aswell

300+

pools made

500+

renovations

1k+

happy customers

BASINGet a Quote

OUR BIGGEST PROJECTS

OUR BIGGEST
PROJECTS

Before: the original 1994 pool
After: the rebuilt pool

SAME HOLE. NEW POOL

This one went in in 1994 and had not been touched since. We kept the footprint, took the shell back to gunite, and rebuilt everything above it. Eleven weeks from demo to first swim.

A sound gunite shell can be resurfaced instead of replaced. It saves around forty percent against a new build, and most pools still have one worth keeping.

Demo, plumbing, tile, plaster, decking. You get the schedule before you sign, including which two weeks are the loud ones.

SAME HOLE.NEW POOL

This one went in in 1994 and had not been touched since. We kept the footprint, took the shell back to gunite, and rebuilt everything above it. Eleven weeks from demo to first swim.

Before: the original 1994 pool
After: the rebuilt pool

A sound gunite shell can be resurfaced instead of replaced. It saves around forty percent against a new build, and most pools still have one worth keeping.

Demo, plumbing, tile, plaster, decking. You get the schedule before you sign, including which two weeks are the loud ones.

NEW POOL OR RENOVATION?

FROM $65,000

NEW POOLS

For the backyard that has nothing yet. Concrete or fibreglass, designed in 3D before we dig a single hole.

See new pools

NEW POOL ORRENOVATION?

FROM $65,000

NEW POOLS

For the backyard that has nothing yet. Concrete or fibreglass, designed in 3D before we dig a single hole.

See new pools

HOW IT GOES

Five steps from the first call to the first swim.
Every one of them has a date on it.

  1. Step 01: Design

    1 to 2 weeks

    A site visit, measurements, and a 3D render of the pool sitting in your yard before anything is signed.

  2. Step 02: Approvals

    4 to 8 weeks

    Council permits and engineering. We handle the paperwork and tell you exactly where it is.

  3. Step 03: Dig

    1 week

    Excavation and steel. The loud week. We fence it, we clean up, we keep you posted daily.

  4. Step 04: Build

    6 to 8 weeks

    Shell, plumbing, tiling, equipment and the surrounds. One crew, one site manager, one number to call.

  5. Step 05: Swim

    Day one

    Handover, water balance and a walkthrough of every valve. Then the part you paid for.

Most new pools: 14 to 20 weeks from dig to swim. Renovations: 3 to 6 weeks.

Book a free site visit

HOW IT GOES

Five steps from the first call to the first swim. Every one of them has a date on it.

  1. Step 01: Design

    1 to 2 weeks

    A site visit, measurements, and a 3D render of the pool sitting in your yard before anything is signed.

  2. Step 02: Approvals

    4 to 8 weeks

    Council permits and engineering. We handle the paperwork and tell you exactly where it is.

  3. Step 03: Dig

    1 week

    Excavation and steel. The loud week. We fence it, we clean up, we keep you posted daily.

  4. Step 04: Build

    6 to 8 weeks

    Shell, plumbing, tiling, equipment and the surrounds. One crew, one site manager, one number to call.

  5. Step 05: Swim

    Day one

    Handover, water balance and a walkthrough of every valve. Then the part you paid for.

Most new pools: 14 to 20 weeks from dig to swim. Renovations: 3 to 6 weeks.

Book a free site visit

The record

300 pools. 17 years. One crew.

ROC #274881 · BONDED AND INSURED · 4.9 FROM 182 GOOGLE REVIEWS

“They dug on the Monday they said they would.” Dana R., Arcadia

The record

300 pools.17 years.One crew.

ROC #274881 · BONDED AND INSURED · 4.9 FROM 182 GOOGLE REVIEWS

“They dug on the Monday they said they would.” Dana R., Arcadia

GET AQUOTE

Four questions. We call you within one business day to book a free site visit.

  • No obligation, no sales visit until you ask for one.
  • A written price after the site visit, not a phone estimate.
  • Same person from first call to first swim.

Rather talk? Call 0400 000 000, 7am to 6pm.

TELL US ABOUT THE YARD

We reply within one business day. No spam, no pressure.

GET AQUOTE

Four questions. We call you within one business day to book a free site visit.

  • No obligation, no sales visit until you ask for one.
  • A written price after the site visit, not a phone estimate.
  • Same person from first call to first swim.

Rather talk? Call 0400 000 000, 7am to 6pm.

TELL US ABOUT THE YARD

We reply within one business day. No spam, no pressure.

Before you ask

Still stuck? Call 0400 000 000, seven to six, six days a week.

Between $80 and $140 a month in power and chemicals for most of what we build, less again on a variable speed pump. We size the equipment for the pool, not for the invoice.

Before you ask

Still stuck? Call 0400 000 000, seven to six, six days a week.

Between $80 and $140 a month in power and chemicals for most of what we build, less again on a variable speed pump. We size the equipment for the pool, not for the invoice.